The magnet has simple siting requirements, is lightweight (approximately 3.5 tons), and has an ultra-short bore-length of 145 cm. Once installed, the system is designed to provide an optimal operating cost, which could save facilities as much as 50 percent on their MR energy bill compared with older systems. Further, the system’s advanced magnet design is engineered to ensure maximum product uptime with a zero helium boil-off magnet.